Programmes · status as of 21 October 2026

Every programme, one board.

Twelve products, the foundation they stand on and three hybrid features, grouped by where they work: Earth, the Moon, Mars, and across all three. Each shows its status label and its test count, with the population named.

Product tests692
Integrated tests410
RC3 security-gate checks677
GatesG0 + G1 complete
01 Read this first

Three counts. Never mixed.

PRODUCT TESTS

692

Unit and product tests across the twelve products, the foundation and the hybrid features: foundation 249, S1–S6 220, SPACETRACE 29, S7–S9 105, hybrid 89.

INTEGRATED TESTS

410

The COSRYX V2 integrated suite behind code gates G0 and G1 (C0–C9 GO), with 5,447/5,447 manifest entries.

RC3 SECURITY-GATE CHECKS

677

The internal security freeze. Internal, not an external audit: the external audit has not been completed.

02 The board

Filter by where the work happens.

EARTH · S1Built · Simulation-validated

COSRYX-LENS

Planetary imaging intelligence. Each derived image carries a receipt binding it to the model version, input data and processing chain that made it.

29product tests
EARTH · S2Built · Simulation-validated

COSRYX-WATCH

Conjunction and anomaly alerts, receipted so an operator can later prove which observations a warning came from.

33product tests
EARTH · S3Built · Simulation-validated

COSRYX-WEATHER

Space-weather forecasts bound to the observations they derive from, so a mission decision can be traced back to its inputs.

34product tests
EARTH · N13Built · Ground-demonstrated

SPACETRACE

SSA data provenance: sensor observation → conjunction alert → spacecraft action, as one checkable chain.

29/29product tests
EARTH · S8Built · Ground-demonstrated

SSA ACCOUNTABILITY

Liability evidence for satellite and debris-removal operators: prove a warning was given and a manoeuvre was reasoned.

34product tests
EARTH ORBIT · S9Built · Ground-demonstrated

MFG PROVENANCE

Designed to certify that a fibre, material or pharmaceutical batch was made in orbit, on a given date, by a given process. A demonstrated design, not a service.

33product tests
MOON · FOUNDATIONSimulation-validated

DSRP

Deep Space Relay Protocol: store-and-forward trust across delayed, interrupted links. 100/100 simulation scenarios in SIM-LUNAR-01.

78product tests
MOON → MARS · S6Built · Simulation-validated

COSRYX-NEXUS

Custody across Earth → Moon → Mars: signed custody receipts per hop, N-of-M witness signatures, byte-identical replay.

65product tests
MARS · S4Built · Simulation-validated

COSRYX-MCC

Mission control intelligence: recommendations with sources, confidence and assumptions; high-impact actions need a human countersign. Needs the V3 AIRGAPKIT, in development.

28product tests
MARS · S5Built · Simulation-validated

COSRYX-EDGE

On-board autonomy assurance: model integrity checks, scrub-and-refresh, signed update channel; executes within signed bounds.

31product tests
MARS · S7Built · Simulation-validated

SWARM TRUST

A receipt for every decision a robot swarm makes, including during a blackout; tolerates faulty units and quarantines a rogue one.

38product tests
MARS · NEWIn development

Mission health heartbeat

Signed subsystem health every 5–10 minutes, relayed via orbiter to Earth. Not in the test totals.

—not yet counted
CROSS-MISSION · FOUNDATIONTested

PQ-Agility

Hybrid signatures, a cryptographic bill of materials and key management for space and ground. X-Wing (IETF draft), implemented and tested with the draft vectors, not yet deployed; CBOM 11/11.

109product tests
CROSS-MISSION · FOUNDATIONBuilt

AI Sovereignty Oracle

The foundation layer the products share. The foundation total, which includes PQ-Agility and DSRP, is 249 tests with 0 known CVEs.

249foundation tests
CROSS-MISSION · PLATFORMBuilt · G0 + G1 complete

Mission Recorder V2

The verifiable mission recorder and distributed mission black box: C0–C9 GO, 5,447/5,447 manifest entries.

410integrated tests
CROSS-MISSION · HYBRID-01Built · definition-of-done sign-off pending

Radiation quarantine

Model, enclave, output and replay digests bound in one record; a replay mismatch quarantines it before a clean receipt can exist.

24/24product tests
CROSS-MISSION · HYBRID-02Built · definition-of-done sign-off pending

Dual-leg image provenance

Both signature legs must verify over identical canonical bytes; single-leg and downgrade paths are rejected. PQ leg: ML-DSA-65 (FIPS 204) via the R-Series engine; software key custody; not flight-qualified.

37/37product tests
CROSS-MISSION · HYBRID-03Built · definition-of-done sign-off pending

Air-gapped tool receipts

Local tool calls produce chained receipts holding hashes of inputs and outputs, never the raw payloads; no network modules.

28/28product tests
03 How 692 adds up

The product-test total, by wave.

249Foundation
220S1–S6
29SPACETRACE
105S7–S9
89Hybrid 01–03

249 + 220 + 29 + 105 + 89 = 692 product tests. S1–S6 is LENS 29, COSRYX-WATCH 33, WEATHER 34, MCC 28, EDGE 31 and NEXUS 65. S7–S9 is SWARM TRUST 38, SSA ACCOUNTABILITY 34 and MFG PROVENANCE 33. The 410 integrated tests and the 677 RC3 checks are separate populations and are not added in.

04 What the labels mean

Nine words, used exactly.

LabelMeaning on this site
BuiltCode complete, with its test suite passing internally.
Simulation-validatedBehaviour checked in simulated mission scenarios. Simulation is not flight.
Ground-demonstratedShown working on the ground, end to end at the named seam.
TestedTested against published vectors or suites, as stated.
Hardware-blockedWaiting on target hardware before it can move.
Audit not completedNo external audit has been completed.
In developmentBeing built now; no result claimed yet.
PlanningScoped and sequenced; not started.
Future directionWhere the work could lead. Not a product.
05 The trust layer under all of it

One receipt format, every product.

Every COSRYX product issues DCS R-Series receipts: hybrid Ed25519 + ML-DSA-65 signatures, hash-chained, checkable offline by anyone with the public keys. That is why products from different missions can link: a LENS image, a COSRYX-WATCH alert and an EDGE decision are all the same kind of evidence.

We do not replace mission security; we add mission evidence.

06 Gates

Two closed internally. Six ahead.

GateWhat it coversState
G0Scope, IP and evidence freezeComplete
G1V2 codebase complete · C0–C9 GO · 410/410 integrated testsComplete
G2External security auditAudit not completed
G3Radiation testing · next on the roadmapPlanning
G4Hardware-in-the-loopPlanning
G5LEO shadowPlanning
G6LunarPlanning
G7MarsPlanning
07 Roadmap

What happens next, in order.

DONE · INTERNAL

Gates G0 + G1, RC3, 12 products

Code complete and internally test-green; internal security freeze done.

NEXT

Radiation testing (G3)

Pending. Until it is done, nothing on this site is radiation-qualified.

THEN

Our own 6U CubeSat

Target about 18 months after radiation testing. Planning stage, subject to funding and licensing. No launch contract is signed.

IF FUNDING ALLOWS

A second, larger CubeSat

So DCS operates its own satellite capacity. Funding-dependent.

LATER

G4–G7

Hardware-in-the-loop, LEO shadow, lunar and Mars acceptance.

FUTURE DIRECTION

Earth–Moon–Mars network

One verifiable communication and evidence network. Read more.

08 Limits

What these numbers do not say.

Test counts are internal. They show the code does what its suites check, in simulation or on the ground. They do not show behaviour in orbit, under radiation, or on flight hardware.

Internal security freeze (RC3) complete · External audit not completed · No flight qualification claimed.

The post-quantum (PQ) leg uses ML-DSA-65 (FIPS 204) via the R-Series engine. Key custody in this stage is software; hardware custody certification is pending. Not flight-qualified. Not independently audited.

Earlier internal soak records were withdrawn on 30 August 2026 because the verdict logic could not report a failure; corrected records will be re-issued as a set. See the evidence page on cosryx.com.

09 Questions

On the programmes.

Why is the health heartbeat not counted?

Its code is reported as written around 27 August 2026, but it has not been added to the published test totals. It stays "In development" until it is.

What does "definition-of-done sign-off pending" mean on the hybrid features?

The three hybrid features are built and their suites pass internally (89 product tests). The definition-of-done sign-off is still pending, and the label will stay until it is recorded.

Can I see the evidence?

Write to research@cosryx.com or use the enquiry form.

10 How the numbers are made

Simulated, and labelled as such.

SIM-LUNAR-01, the Mars conformance run, the radiation-integrity simulation and DSRP's scenario matrix, explained.