COSRYX-LENS
Planetary imaging intelligence. Each derived image carries a receipt binding it to the model version, input data and processing chain that made it.
Twelve products, the foundation they stand on and three hybrid features, grouped by where they work: Earth, the Moon, Mars, and across all three. Each shows its status label and its test count, with the population named.
Unit and product tests across the twelve products, the foundation and the hybrid features: foundation 249, S1–S6 220, SPACETRACE 29, S7–S9 105, hybrid 89.
The COSRYX V2 integrated suite behind code gates G0 and G1 (C0–C9 GO), with 5,447/5,447 manifest entries.
The internal security freeze. Internal, not an external audit: the external audit has not been completed.
Planetary imaging intelligence. Each derived image carries a receipt binding it to the model version, input data and processing chain that made it.
Conjunction and anomaly alerts, receipted so an operator can later prove which observations a warning came from.
Space-weather forecasts bound to the observations they derive from, so a mission decision can be traced back to its inputs.
SSA data provenance: sensor observation → conjunction alert → spacecraft action, as one checkable chain.
Liability evidence for satellite and debris-removal operators: prove a warning was given and a manoeuvre was reasoned.
Designed to certify that a fibre, material or pharmaceutical batch was made in orbit, on a given date, by a given process. A demonstrated design, not a service.
Deep Space Relay Protocol: store-and-forward trust across delayed, interrupted links. 100/100 simulation scenarios in SIM-LUNAR-01.
Custody across Earth → Moon → Mars: signed custody receipts per hop, N-of-M witness signatures, byte-identical replay.
Mission control intelligence: recommendations with sources, confidence and assumptions; high-impact actions need a human countersign. Needs the V3 AIRGAPKIT, in development.
On-board autonomy assurance: model integrity checks, scrub-and-refresh, signed update channel; executes within signed bounds.
A receipt for every decision a robot swarm makes, including during a blackout; tolerates faulty units and quarantines a rogue one.
Signed subsystem health every 5–10 minutes, relayed via orbiter to Earth. Not in the test totals.
Hybrid signatures, a cryptographic bill of materials and key management for space and ground. X-Wing (IETF draft), implemented and tested with the draft vectors, not yet deployed; CBOM 11/11.
The foundation layer the products share. The foundation total, which includes PQ-Agility and DSRP, is 249 tests with 0 known CVEs.
The verifiable mission recorder and distributed mission black box: C0–C9 GO, 5,447/5,447 manifest entries.
Model, enclave, output and replay digests bound in one record; a replay mismatch quarantines it before a clean receipt can exist.
Both signature legs must verify over identical canonical bytes; single-leg and downgrade paths are rejected. PQ leg: ML-DSA-65 (FIPS 204) via the R-Series engine; software key custody; not flight-qualified.
Local tool calls produce chained receipts holding hashes of inputs and outputs, never the raw payloads; no network modules.
249 + 220 + 29 + 105 + 89 = 692 product tests. S1–S6 is LENS 29, COSRYX-WATCH 33, WEATHER 34, MCC 28, EDGE 31 and NEXUS 65. S7–S9 is SWARM TRUST 38, SSA ACCOUNTABILITY 34 and MFG PROVENANCE 33. The 410 integrated tests and the 677 RC3 checks are separate populations and are not added in.
| Label | Meaning on this site |
|---|---|
| Built | Code complete, with its test suite passing internally. |
| Simulation-validated | Behaviour checked in simulated mission scenarios. Simulation is not flight. |
| Ground-demonstrated | Shown working on the ground, end to end at the named seam. |
| Tested | Tested against published vectors or suites, as stated. |
| Hardware-blocked | Waiting on target hardware before it can move. |
| Audit not completed | No external audit has been completed. |
| In development | Being built now; no result claimed yet. |
| Planning | Scoped and sequenced; not started. |
| Future direction | Where the work could lead. Not a product. |
Every COSRYX product issues DCS R-Series receipts: hybrid Ed25519 + ML-DSA-65 signatures, hash-chained, checkable offline by anyone with the public keys. That is why products from different missions can link: a LENS image, a COSRYX-WATCH alert and an EDGE decision are all the same kind of evidence.
We do not replace mission security; we add mission evidence.
| Gate | What it covers | State |
|---|---|---|
| G0 | Scope, IP and evidence freeze | Complete |
| G1 | V2 codebase complete · C0–C9 GO · 410/410 integrated tests | Complete |
| G2 | External security audit | Audit not completed |
| G3 | Radiation testing · next on the roadmap | Planning |
| G4 | Hardware-in-the-loop | Planning |
| G5 | LEO shadow | Planning |
| G6 | Lunar | Planning |
| G7 | Mars | Planning |
Code complete and internally test-green; internal security freeze done.
Pending. Until it is done, nothing on this site is radiation-qualified.
Target about 18 months after radiation testing. Planning stage, subject to funding and licensing. No launch contract is signed.
So DCS operates its own satellite capacity. Funding-dependent.
Hardware-in-the-loop, LEO shadow, lunar and Mars acceptance.
One verifiable communication and evidence network. Read more.
Test counts are internal. They show the code does what its suites check, in simulation or on the ground. They do not show behaviour in orbit, under radiation, or on flight hardware.
Internal security freeze (RC3) complete · External audit not completed · No flight qualification claimed.
The post-quantum (PQ) leg uses ML-DSA-65 (FIPS 204) via the R-Series engine. Key custody in this stage is software; hardware custody certification is pending. Not flight-qualified. Not independently audited.
Earlier internal soak records were withdrawn on 30 August 2026 because the verdict logic could not report a failure; corrected records will be re-issued as a set. See the evidence page on cosryx.com.
Its code is reported as written around 27 August 2026, but it has not been added to the published test totals. It stays "In development" until it is.
The three hybrid features are built and their suites pass internally (89 product tests). The definition-of-done sign-off is still pending, and the label will stay until it is recorded.
Write to research@cosryx.com or use the enquiry form.
SIM-LUNAR-01, the Mars conformance run, the radiation-integrity simulation and DSRP's scenario matrix, explained.